Bunker Wharves

Prins Hendrik Wharf

Location: In the Schottegat on the North-Western corner of the St. Anna Bay channel
Type: Quay
Draft: 10.4m
Length: 211m
Construction: Steel piles, concrete top, concrete floor
Main functions: Lay-by berth, bunkering
Facilities: Water-bunkering, bunkering ex-pipeline, bunkering through two pipelines (12” & 6” diameter), rate of delivery 250 tons per hour on average.

Oranje Wharf

Location: West side of the St. Anna Bay channel
Type: Quay
Draft: 5.8m
Length: 90m berth
Construction: Sheet piling, concrete top
Main functions: Bunkering
Facilities: Bunkering through two pipelines (12” & 6” diameter), rate of delivery 250 tons per hour on average.

Motet Wharf

Location: West side of the St. Anna Bay channel
Type: Quay
Draft: 10.1m
Length: 190m
Construction: Sheet piling, concrete top
Main functions: Bunkering and alternative cruise terminal
Facilities: Water-bunkering, bunkering through two pipelines (12” & 6” diameter), rate of delivery 250 tons per hour on average.

Nieuwe Wharf

Location: West side of the St. Anna Bay channel
Type: Quay
Draft: 10.1m
Length: 170m
Construction: Sheet piling, concrete top
Main functions: Cruise passenger terminal, bunkering
Facilities: Bunkering through two pipelines (12” & 6” diameter), rate of delivery 250 tons per hour on average.

West Wharf I

Location: West side of the St. Anna Bay channel
Type: Quay
Draft: 7.7m
Length: 146m
Construction: Sheet piling, concrete top, asphalt floor
Main functions: Cruise passenger terminal, bunkering
Facilities: Water-bunkering through fire hose, fuel bunkering through pipelines, 250 tons per hour on average.

West Wharf II

Location: West side of the St. Anna Bay channel
Type: Quay
Draft: 11m
Length: 132m
Construction: Sheet piling, concrete top, asphalt floor
Main functions: Cruise passenger terminal, bunkering
Facilities: Water through fire hose from Nieuwe Wharf and bunkering through pipelines, 250 tons per hour on average.

Mathey Wharf

Location: West side of the St. Anna Bay channel
Type: Quay
Draft: 9.90m
Length: 198m
Construction: Sheet piling, concrete top, asphalt floor
Main functions: Cruise passenger terminal, bunkering 
Facilities: Water-bunkering, bunkering through pipelines, 250 tons per hour on average.