Semi-submersible platform in Curacao from Brasil

23 augustus 2019

The OOS Gretha, a Semi-Submersible maintenance platform, made the transit from Brasil to Curacao for a technical stop at the new “Tula-pier” (Mega pier no.2). After 12 days, the platform shifted the St. Michaelsbay buoy for additional work, and remains there pending completion of the work scope and mobilization to her new job site.

 

The OOS Gretha can be seen in the aerial picture, while at the Tula-pier (draft is 20+ meters), while a cruise ship is moored at the Megapier no.1. (draft is 16.5 + meters).